Full Project Management
King Abdallah II School for Excellence
The whole project completed within 6 months only including all skeleton and Finishing works for built up area of 8000 m2 (4 floors). consisting of 21 class rooms, 1 theater, 4 science laboratories and 3 computer labs
Full Project Management & Contractual Consultation
Primary and Secondary Water Networks Restructuring – Zarka
one of Water projects implemented under the grant from the US Millennium Challenge Corporation (MCC).
The project include the rehabilitation and expansion of the wastewater network, the rehabilitation and restructuring of water networks executed by Haymour cousins and partner contracting Co.
Full Project Management & Contractual Consultation
Lajjon Water Project
مشروع جر مياه اللجون من الكرك
الحائز على جائزة وزارة الأشغال العامة لتنفيذ المقاولات
Project executed by Diran Contracting Company and wins in Ministry of Public Works and Housing on 2005
Full Project Management & Contractual Consultation
Qwaismeh Stadium
Project executed by Diran Contracting Company and Full Project Management done by Eng. Said Hamdan
Full Project Management & Contractual Consultation
Parking Sheds for Kkmc
Project executed by Abdulatif Al Abulatif at Hafer Al – Batin – KSA all Project consists of steel structure sheds. Full Project Management done by Eng. Said Hamdan
Full Construction management services
W- Amman Hotel Project – Abdali 2017-2018
Engineering Procurement and Construction of Fit-out works Levels 36 & 37 between Saraya Abdali Real Estate Investments Company PSC, and Technical Arab Contracting Group “TACG”.
Full Construction management services
St. Regis – Amman Hotel & Residences Project 2018-2020
Project Description: Fabrication and Installation of Marble, Porcelain Tiles for Walls and Floors for 159 King Rooms, Serviced Apartments and Suites. In addition to Branded Apartments and Podium Area. The Employer for the Project is M/s. Consolidated Project Development for Interior Decoration “CPD”, and the Contractor M/s. Technical Arab Contracting Group “TACG”.
LCM Scope: Study all project documents including Contracts, letters and all submittals and prepare full claim accordingly for Extension of Time and Additional cost using both windows analysis and as planned techniques as per Employer request. Then continue with Contractor in Arbitration stage by preparing all documents for Arbitration as requested and attending sessions of Arbitration. |
Full Construction management services
Queen Rania Foundation Offices Project 2019-2020
Project Description: The Work comprises of demolition, structural works, and Stone Façade Cleaning, finish and MEP Refurbishment, Testing, Commissioning and Handing over of Queen Rania Foundation (QRF) Offices Building locates in Dabouq area, total existing built-up area is approximately 2000 m2.
The Contractor of the Project was Al Naser Contracting Company. LCM Scope: Contractual Consultancy, Planning & Scheduling services including: · Prepare Baseline Schedule Fully loaded (resources & cost) · Prepare updated schedules and bi- weekly report and highlight of activities behind schedule and provide recommendations to avoid delays. · Highlight of delays in bi-weekly reports which is considered notification for extension of time and resulted in getting approval on 1 month extension of Time at the end of the project amicably. · Review overall Contract Documents, Minutes of Meetings, and Letters. · Prepare contractual letters. |
Full Construction management services
Aramex Jordan Warehouses – Amman 2018
Project Description: All Civil, Finishing & MEP works for Aramex Jordan warehouses extension of steel structure hangers with total built-up area of 5540 m2 in addition to External works.
Employer: Aramex Jordan Engineer: Rukon Al Handaseh Contractor: Technical Arab Contracting Group (TACG).
LCM Scope: Study all project documents including Contracts, letters and all submittals and prepare full claim accordingly for Extension of Time and negotiate with Engineer who has approved extension of time of 122 days. |
Full Construction management services
Construction of Water Distribution Network for Sarieh District 2019-2020
Project Description: The project is in Irbid City. Includes Supply and installation of potable water HDPE pipes with an approximate total length of 84.4 km . in addition to Supply and installation of potable water Ductile Iron pipes in diameters 100mm, 150mm, 300mm and 400 mm DI with an approximate total length of 15 km in Sarieh district.
The Employer: Ministry of Water and Irrigation / United Nations Office for Project Services (UNOPS). Contractor: Nimer Al-Lawzi and partners contracting CO.
LCM Scope: Planning & Scheduling services including: · Prepare Baseline Schedule Fully loaded (resources & cost) according to special requirements of UNOPS. · Prepare updated schedules and monthly reports highlighting activities behind schedule and provide recommendations to avoid delays. |
Full Construction management services
Al-Shiekh Mohammed Bin Butti Villa – Dubai 2020
Project Description: MEP works for Al-Shiekh Mohammed Bin Butti Villa with total Lump Sum amount of AED 10,790,000.
Main Contractor: Royal International Construction – Abu Dhabi. Sub-Contractor: Consolidated Proserve Electromechanical Work L.L.C.
LCM Scope: Study all project documents for sub-contractor including Contracts, letters and all submittals to extract delay events and prepare Time Impact Analysis using Windows method. |
Full Construction management services
Construction of Carnallite Gates – Dead Sea 2020-2022
Project Description: The project is located on the shore of the Dead Sea. The Contractor scope including executing the gated culvert to transfer brine between carnallite ponds compromise of 10 gates.
The Employer: Arab Potash Company Ltd. Engineer: Dar Al Handasa (DAR) Contractor: Ali Saleh Al Tarawneh & Sons Co. (ATC) LCM Scope: Planning & Scheduling services including: · Prepare Baseline Schedule Fully loaded (resources & cost) · Prepare updated schedules and monthly reports highlighting activities behind schedule and provide recommendations to avoid delays. · Review overall Contract Documents, Minutes of Meetings, and Letters. · Prepare full claim for Extension of Time and additional costs Then continue with Contractor in Arbitration stage by preparing all documents for Arbitration as requested by Contractor. |
Full Construction management services
Open Society Foundations New Offices Project 2021
Project Description: The project is located on 6th Floor in Abdali Investment & Development with approximate area of 560m2. The Contractor scope includes Renovation works of the existing building consisting of Interior Finishes & MEP Works.
LCM Scope: Contractual Consultancy, Planning & Scheduling services including: · Prepare Baseline Schedule Fully loaded (resources & cost) · Prepare updated schedules and bi- weekly report and highlight of activities behind schepdule and provide recommendations to avoid delays. · Highlight of delays in bi-weekly reports which is considered notification for extension of time and resulted in getting approval on 2 months extension of Time at the end of the project amicably. · Review overall Contract Documents, Minutes of Meetings, and Letters. · Prepare contractual letters. |
Full Construction management services
Construction of Underground HDPE Water Pipeline to Supply APC Plants Reservoirs from Safi Pumping Station 2021
Project Description: The project is Gawr as- Safi in Jordan Valley. Includes constructing, supplying, installing, and testing for Underground HDPE Water Pipeline to supply APC Plants reservoirs from Safi Pumping Station with an approximate total length of 7.4 km.
The Employer: Arab Potash Company Contractor: Nimer Al-Lawzi and partners contracting CO. LCM Scope: Planning & Scheduling services including: · Prepare Baseline Schedule Fully loaded (resources & cost · Prepare updated schedules and monthly reports highlighting activities behind schedule and provide recommendations to avoid delays.
|
Full Construction management services
Construction of Water House Connections for Sarieh District 2021-2022
Project Description: The project is in Irbid City. Includes Supply and installation of potable water HDPE pipes with an approximate total length of 5.4 km for main lines in addition to Supply and installation of material for house connection either HDPE or CPVC pipes to replace the existing house connection or new house connections including fittings and valves in Sarieh district.
The Employer: United Nations Office for Project Services (UNOPS). Contractor: Nimer Al-Lawzi and partners contracting CO.
LCM Scope: Planning & Scheduling services including: · Prepare Baseline Schedule Fully loaded (resources & cost) according to special requirements of UNOPS. · Prepare updated schedules and monthly reports highlighting activities behind schedule and provide recommendations to avoid delays. |
Full Construction management services
Construction of the Water House Connections for Hawwarra District 2021-2022
Project Description: The project is in Irbid City. Includes Supply and installation of potable water HDPE pipes with an approximate total length of 9.85 km for main lines in addition to Supply and installation of material for house connection either HDPE or CPVC pipes to replace the existing house connection or new house connections including fittings and valves in Sarieh district.
The Employer: United Nations Office for Project Services (UNOPS). Contractor: Joint Venture Nimer Al-Lawzi and partners contracting CO.
LCM Scope: Planning & Scheduling services including: · Prepare Baseline Schedule Fully loaded (resources & cost) according to special requirements of UNOPS. · Prepare updated schedules and monthly reports highlighting activities behind schedule and provide recommendations to avoid delays. |
Full Construction management services
Water Distribution Performance and Related Sewerage Disposal in Irbid – C1 2021-2023
Project Description: The project is in Irbid City. Major component of the project is the supply and installation of a strengthening water Pipelines including all required pipe appurtenances and ancillary works coming along the same, connecting the new strengthening water pipelines with the existing water pipelines and as specified in the tender documents disconnecting some of the existing water pipelines along the district boundaries, 111 additions to a new connection with the existing Zebda ground reservoir
The Employer: Ministry of Water and Irregation/ Water Authority of Jordan (WAJ). Engineer: JV Engicon and Artelia Contractor: Joint Venture Nimer Al-Lawzi and partners contracting CO. and arab business contracting Co. LCM Scope: Planning & Scheduling services including: · Prepare Baseline Schedule Fully loaded (resources & cost) · Prepare updated schedules and monthly reports highlighting activities behind schedule and provide recommendations to avoid delays. · Review overall Contract Documents, Minutes of Meetings, and Letters. · Prepare a revised schedule considering mitigation actions to minimize delays and complete the project on time. |
Full Construction management services
Task Force Operations Center, KA2 Air Base, Jordan 2021-2022
Project Description: The Work comprises of the design and construction of a modular facility for the Task Force Operations Center mission at King Abdullah II Air Base (KA2AB), Jordan. The building locates in Al – Zarqa, with total built-up area of approximately 1000 m2.
Employer : United States Army Corps of Engineers (USACE) Designer under Contractor : Arabtech Jardaneh Contractor : Areaka Trading and Logistics LCM Scope: Contractual Consultancy, Planning & Scheduling services including: · Prepare Baseline Schedule Fully loaded (resources & cost) including both design and construction stages. · Prepare updated schedules and weekly report and highlight of activities behind schedule and provide recommendations to avoid delays. · Attendance of weekly meeting with the Employer to highlight delays in weekly reports to resolve causes of delays. · Review overall Contract Documents, Minutes of Meetings, and Letters. · Prepare Extension of Time report for delays occurred using Impacted as built technique and get approval by Employer. |
Full Construction management services
Ibn Seina University for Medical sciences 2022 -2023
Project Description: The project is in Al-Qastal, 2 km from Queen Alia International Airport towards Amman, and about 27 km from the Seventh Circle. The university consists of 5 main buildings (the Faculty of Medicine and the Faculty of Dentistry building, the presidency building and the cafeteria) with a total built up area of 40 thousand square meters.
LCM Scope: Owner Representing Consultancy services including: · Prepare implementation plan for the project. · Prepare Schedule of work and highlighting critical path. · Review quantities submitted in interim payments by Contractors before disbursing them from the owner. |
Full Construction management services
World Bank Project 2023
Project Description: Renovation works of the existing building consisting of Interior Finishes , MEP Works, and fit outs.
LCM Scope: Contractual Consultancy, Planning & Scheduling services including: · Prepare Baseline Schedule Fully loaded (resources & cost) · Prepare updated schedules and monthly report and highlight of activities behind schedule and provide recommendations to avoid delays. |
Full Construction management services
Canteen Arab Bank Project 2023-2024
Project Description: The project is in Amman and included rehabilitation of Garden for Arab Bank and utilize it as canteen and rest area for employees. Including all finishing , MEP and furnishing works.
LCM Scope: Contractual Consultancy, Planning & Scheduling services including: · Prepare Baseline Schedule Fully loaded (resources & cost) · Prepare updated schedules and monthly report and highlight of activities behind schedule and provide recommendations to avoid delays. · Review overall Contract Documents, Minutes of Meetings, and Letters. · Prepare extension of time report. |